All News
11 February 2021
11 February 2021
Isdemir Plant of OYAK Mining and Metallurgy placed an order to substitute the other two water boxes in Line B after granting Russula final acceptance for two WB installed in Line A.
Do you like it?
3 February 2021
3 February 2021
How much time do you lose in unexpected stops? Like a Formula 1 driver, a steel mill needs to be ready to run.
Do you like it?
11 January 2021
11 January 2021
Mill Pulse® is designed exclusively for the rolling process to manage, harmonize, and control all production activities.
Do you like it?
30 December 2020
30 December 2020
After an intense audit, Russula received the ISO 45001 Occupational Health and Safety Management certification.
Do you like it?
22 December 2020
22 December 2020
The CELSA Group™ has begun the equipment installation phase for its new rolling mill in Boucau-Tarnos, France.
Do you like it?
18 November 2020
18 November 2020
Russula and SFTC collaborated in a project to eliminate product defect and rolling instability occurring at a section mill.
Do you like it?
6 November 2020
6 November 2020
New pass design finalized in 2 weeks using simulation software DEFORM®.
Do you like it?
30 October 2020
30 October 2020
Russula and SFTC, provider of engineering software DEFORM®, have announced a collaboration agreement.
Do you like it?
23 October 2020
23 October 2020
NSBS awards Russula a contract to supply the melt shop water treatment systems for an expansion project.
Do you like it?
9 October 2020
9 October 2020
The Nucor Steel plant in Jewett, Texas, together with Russula, upgraded the drives for the TX #1 bar mill.
Do you like it?